775 654 443

What drives the price of sheet metal work

Gutter along the gable of a house

A price list for sheet metal work is among the most searched and least useful things in the trade. Two buildings of the same length can differ widely in a quote without anyone trying to overcharge. These are the items that create that difference.

Developed width, not just metres

A sheet metal part is charged by how wide a strip it is folded from, not by length alone. A drip edge folded from a narrow strip and a parapet cover sheet folded from a wide one share the same running metre and consume entirely different amounts of material and labour. A quote with no developed width given therefore cannot be compared with another quote.

Material

Between plastic-coated steel and copper there is a substantial difference on the same building. It is not only about the price of the metal: the choice is limited by what is already there, because some metals must not meet, not even through water running off one onto the other.

Access at height

Often a bigger item than the metal itself. Working from a ladder is one thing, from scaffolding another, from a platform another, and on ropes another again. One and the same metre of gutter can be markedly dearer in a quote purely because of how you get to it.

Number of corners, valleys and penetrations

A straight run is quick. Every corner, every valley, every dormer and every penetration is hand work with its own fold and its own junction. A broken-up building with several dormers is therefore dearer per metre than a simple shape, even with the same material.

Condition of the substrate

A rotten fascia board, a cracked parapet or a crumbling chimney neck has to be put right before anything is anchored into it. This often only shows up at the site measurement, and it is a legitimate reason why a quote differs from a first estimate given over the phone.

Removal and disposal

The old system has to come down, be sorted and taken away. On a larger building that is a line of its own, not a trifle done in passing.

What follows from this

A serious quote follows a site measurement and names the material and the developed width. If a quote carries only one figure and the description sheet metal work, you have nothing to compare and you risk items appearing mid-job that you had not counted on.

You can describe your job in the form.

Back to the blog

Describe the job

A few sentences and the location are enough. We read every enquiry and pass it to a sheet metal firm that works in your area. If we have nobody there, we tell you straight away.